that needed it. Once the deck crew flipped them back to top side up, Alen discovered that one of the buoys had been hit and was cracked and so he needed to do some grinding and patching before painting the yellow. So we are going to finish the paint job early tomorrow after the patch has time to cure.
Sunday, January 17, 2010
Today was not all that physically demanding which is good since it was 30.5 degrees Celsius by 9:30 AM ship time. My students should be able to figure out the temperature in temperature units they are more familiar with.While it was still fairly cool this morning Art and Rick helped Alen paint the anti fouling paint on the bottom of each of the three tolroids
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment